- ALICE CTP - layout in the experimental
cavern, racks C24 to C28 (ps)
- ALICE CTP - internal cable and optical
connections (ps)
- Trigger input patch-panels - rack C25 (ps
May
2008, doc May 2009,
pdf December 2014)
- Connections to the LTU's Pulser
input (ltu_pulser1.pdf
ltu_pulser2.pdf
ltu_pulser3.pdf)
- L0 trigger input multiplexer (ppt)
- Optical link patch-panels, racks C24, C26
and C27 (pdf)
- LHC opto patch panel connections (pdf)
- RF2TTC, RF_RX, BOBR (TTC
web page)
-
The interface and structure of the machine
beam synchronous timing message for the LHC experiments (pdf)
- List of sub-detectors that require 20dB
optical attenuators (ps)
- Sub-detector cable and optical
connections - current status (ps format)
- Connections to the optical switch (pdf)
|
Sub-detector |
Location |
Last updated |
|
SDD |
C24T |
17 September 2007 |
|
MTRACK |
C24T |
17 September 2007 |
|
MTRG |
C24T |
20 September 2007 |
|
DAQ |
C24T |
12 September 2007 |
|
SPD |
C24B |
24 September 2007 |
|
TOF |
C24B |
11 October 2007 |
|
V0 |
C24B |
24 September 2007 |
|
TRD |
C26T |
17 September 2007 |
|
ZDC |
C26T |
15 February 2008 |
|
EMCAL |
C26T |
24 September 2007 |
|
TPC |
C26B |
10 June 2008 |
|
PMD |
C26B |
15 February 2008 |
|
ACORDE |
C26B |
17 September 2007 |
|
SSD |
C27T |
15 February 2008 |
|
FMD |
C27T |
15 February 2008 |
|
T0 |
C27T |
12 September 2007 |
|
HMPID |
C27B |
17 September 2007 |
|
PHOS |
C27B |
10 June 2008 |
|
CPV |
C27B |
24 September 2007 |
- Trigger crates - photos (jpg
format)